Proposal/Documents
Presesntations
- PAC37 (2024.1) [slide]
Status report and beamtime request for the 2nd stage.
- PAC36 (2023.7) [slide]
Status report and beamtime request for the 2nd stage.
- PAC35 (2023.1) [slide]
Status report and beamtime request for the 2nd stage.
- PAC34 (2022.8) [slide]
Requested 25(+1)-days at 80 kW for the production.
- PAC33 (2022.1) [full]/[short]
Requested stage-2 approval based on the H4L analysis.
- PAC32 (2021.7) [full]/[short]
Report on the pilot run with a helium-3 target.
- PAC31 (2021.1) [slide]
Requested 1-week beam with helium-3 target before summer shutdown 2021.
- PAC30 (2020.7) [full]/[short]
Report on T77 with helium-4 target. Requested P73 stage-1 approval and 1-week beam with helium-3 target.
- PAC29 (2020.1) [slide]
Request 1-week beam with helium-4 target, report on the ELPH test experiment, etc.
- PAC28 (2019.7) [slide]
Staging strategy, approved 1-week test beam with helium-4
- PAC27 (2019.1) [slide]
Updated proposal
- PAC26 (2018.7) [slide]
Proposal