Last updated : 23/Jan/2006
[Back]


Calibration (ev2ch and intercept)


About 4 runs are summed up (run boundary time is considered).

run part run
1 419-422
2 423-426
3 427-430
4 431-434
5 436
6 438-442
7 443-446
8 447-450
9 451-454
10 455-458
11 459-462
12 466-468
13 471-475
14 476-480
15 481-484
16 485-488
17 489-492
18 493-496
19 497-502
20 503-508
21 509-511
22 512-514
23 519-522
24 523-526
25 527-530
26 531-535
27 536-539
28 540-543
29 544-547
30 548-551
31 552-555
32 556-559
33 560-563
34 564-569
35 571-579
36 580-583


The ev2ch [ev/ch] and intercept [eV] are shown on below figures. The red line is the fit value of the histogram summed up all parts.
Figure 1
Figure 1: sdd1.

Figure 2
Figure 2: sdd2.

Figure 3
Figure 3: sdd3.

Figure 4
Figure 4: sdd4.

Figure 5
Figure 5: sdd5.

Figure 6
Figure 6: sdd7.

Figure 7
Figure 7: sdd8.