News From S160 shift crew
- 20/11/98 08.16.11 Calibration of X vs momentum p and BE(=139.57-Ex(205Pbg.s.)) as determined from the pi0 peak scan varying the SIS energy; p = 0.25562 X + 1689.907 [MeV/c], BE = 6.044 + 0.13197 X.
- 18/11/98 11.17.44 New display of the 1s-2p region with 2 Gaussian fitting.
- 17/11/98 12.55.10 'changebin.kumac' was renewed.Now you can use any ratios to rebin.The usage is 'changebin ID RATIO'.For instance in the case you want to rebin histogram ID=807 into 1/10,type changebin 807 10.When [Ratio] is skipped,it will be rebinned into 1/10.
- 16/11/98 21.31.29 Production run restarted.
- 16/11/98 21.09.54 Statistical error = +-70 keV for the 1s peak, +-15 keV for 2p
- 16/11/98 21.01.10 Nov16: acceptance measurement with 12C on 9Be, successful
- 16/11/98 21.00.14 Nov16; new calibration run with changing d energy
- 12/11/98 17.29.57 "Run# vs CH2 peak" graph became not to appear data point clearly because x-range is more wider than before. Please comment on new graph.This is temporary but better than before.
- 11/11/98 20.48.00 News system is revised
Now you can use