SPIX run summary
Run # Title Start time Stop time Time Beam Momentum Source Foil Discri threshold ADC threshold Remark
1 Test run 16/Aug/06 01:39 16/Aug/06 03:39 2:00 pi-, 1.4mA 300 MeV/c 55Fe Ti 50um, Ni 10 um 1.0 V 500  
2 Test run 16/Aug/06 04:57 16/Aug/06 08:09 3:12 pi-, 1.4mA 300 MeV/c 55Fe Ti 50um, Ni 10 um 1.0 V 500  
3 Test run 16/Aug/06 08:10 16/Aug/06 08:31 0:21 pi-, 400uA 300 MeV/c 55Fe Ti 50um, Ni 10 um 1.0 V 500 beam was unstable
4 Test run 16/Aug/06 08:32 16/Aug/06 09:03 0:31 pi-, 45uA 300 MeV/c 55Fe Ti 50um, Ni 10 um 1.0 V 500 beam was unstable
5 Calibration 16/Aug/06 13:31 16/Aug/06 13:43 0:12 off - 55Fe Ti 50um, Ni 10 um 1.0 V 500 Shaper gain was changed to see 57Co 14kev gamma
6 Test run 16/Aug/06 13:56 16/Aug/06 16:38 2:42 pi-, 140uA 300 MeV/c 55Fe Ti 50um, Ni 10 um 1.0 V 500 SSB11Y was optimized
7 Calibration 16/Aug/06 17:20 16/Aug/06 18:24 1:04 off - 241Am Ni 10um 1.0 V 500  
8 Test run 16/Aug/06 18:47 16/Aug/06 23:05 4:18 pi-, 1.4mA 300 MeV/c 55Fe Ti 200um, Cu 100um 1.0 V 500  
9 Test run 16/Aug/06 23:10 17/Aug/06 00:15 1:05 pi-, 1.4mA 300 MeV/c 55Fe Ti 200um, Cu 100um 1.0 V 500  
10 Test run 17/Aug/06 01:49 17/Aug/06 03:07 1:18 pi-, 1.4mA 300 MeV/c 55Fe Ti 100um, Cu 100um 1.0 V 500 reduced the thickness of Ti foil, and put foils verticaly
11 Test run 17/Aug/06 03:10 17/Aug/06 03:55 0:45 pi-, 1.4mA 300 MeV/c 55Fe Ti 100um, Cu 100um 1.0 V 500 computer was rebooted
12 Test run 17/Aug/06 04:23 17/Aug/06 04:57 0:34 pi-, 1.4mA 300 MeV/c 55Fe Ti 100um, Cu 100um 1.0 V 500 moved the target support
13 Test run 17/Aug/06 05:13 17/Aug/06 05:39 0:26 pi-, 1.4mA 300 MeV/c 55Fe Ti 100um, Cu 100um 1.0 V 500 replaced the foile position, PVC tape was guilty
14 Calibration 17/Aug/06 07:41 17/Aug/06 13:00 5:19 off - 55Fe, 57Co Ti 100um, Cu 100um 1.0 V 500 57Co was installed
15 Test run 17/Aug/06 13:35 17/Aug/06 14:37 1:02 pi-, 1.4mA 300 MeV/c 55Fe Ti 100um, Cu 100um 1.0 V 500 57Co was removed
16 Test run 17/Aug/06 15:21 17/Aug/06 19:40 4:19 pi-, 1.4mA 300 MeV/c 55Fe Ti 100um, Cu 100um 1.0 V 500 Enhanced Ti foil configuration (Ti:Cu = 4:1)
17 Calibration 17/Aug/06 20:30 17/Aug/06 21:06 0:36 off - 55Fe, (57Co) Ti 100um, Cu 100um 1.0 V 500 57Co with Ti and Cu foil was installed at the far side from SDD
18 Production 17/Aug/06 21:07 18/Aug/06 08:06 10:59 pi-, 1.4mA 300 MeV/c 55Fe, (57Co) Ti 100um, Cu 100um 1.0 V 500 sometimes the beam was unstable
19 Calibration 18/Aug/06 08:35 18/Aug/06 13:20 4:45 off - 55Fe, 57Co Ti 100um, Cu 100um 1.0 V 500  
20 Calibration 18/Aug/06 14:38 18/Aug/06 18:39 4:01 off - 55Fe, 57Co Ti 50um, Ni 125um 1.0 V 500 E570 foils were installed
21 Junk 18/Aug/06 19:30 18/Aug/06 20:21 0:51 pi-, 1.4mA 300 MeV/c 55Fe, (57Co) Ti 50um, Ni 125um 1.0 V 500 the foil folder was broken, SDD was turned off
22 Production 18/Aug/06 21:11 19/Aug/06 08:05 10:54 pi-, 1.4mA 300 MeV/c 55Fe, (57Co) Ti 50um, Ni 125um 1.0 V 500  
23 Calibration 19/Aug/06 08:54 19/Aug/06 15:55 7:01 off - 55Fe, 57Co Ti 50um, Ni 125um 1.0 V 500 before this run, SDD was turned off
24 Pedestal run 19/Aug/06 16:42 19/Aug/06 16:43 0:01 off - 55Fe, 57Co Ti 50um, Ni 125um -10mV 0 only measured the pedestal
25 Lower threshold run 19/Aug/06 18:10 19/Aug/06 18:27 0:17 pi-, 1.4mA 300 MeV/c (57Co) Ti 50um, Ni 125um 1.0 V 80 GATE was removed for ADC, 55Fe was removed
26 Production 19/Aug/06 18:28 19/Aug/06 23:34 5:06 pi-, 1.4mA 300 MeV/c (57Co) Ti 50um, Ni 125um 1.0 V 500  
27 Calibration 19/Aug/06 23:53 20/Aug/06 08:16 8:23 off - 57Co Ti 50um, Ni 125um 1.0 V 500 The end of STEP (SDD Test Experiment at PSI)