SDD E549 run summary                                          
Run # Run title Time (h:m:s) 55Fe Beam, Pt (cm) Remarks SDD Voltage            (-R1,-RX,-Back) Shaping Time ADC ; Timing (μm) Shaping Amp Gain Timing Discri. (mV) Cable Length (m) TM (cm*cm) TL (cm*cm) TR (cm*cm) Foil Area (cm*cm) Mylar (μm) Distance from target(m) Cooling Finger Vacuum Gauge (Torr) Temperature (K) LakeShroe Scalar (TKO acc, Reset, Bipolar) Offline Ana Version
1                             188   Brass          
2                             188   Brass          
3   17:25:00 ON       2 100 -30 5ns         188   Brass 4*10^(-8) 64-66      
4   04:50:00 ON       2 350 -100 5ns         188   Brass   64-66      
5   09:30:00 ON       2 350 -100 5ns         188   Brass   75-76      
6                                            
7   10:02:00 ON       2 350 -70 15       4*4 188+188   Cu OFF 50.001      
8                                            
9                                            
10 Calibration 00:39:00 ON     5.14, 100.0, 60.0 2 ; 0.5   -71 6 ; 5 (pre ; shape)       4*4 188+188(hole)   Cu OFF 80 stable    
11 Calibration 04:36:00 ON   changed discriminator threshold -71mV->-100mV 5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80 stable    
12 Calibration 00:41:00 ON     5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80 stable    
13 Calibration 00:27:00 ON   after this run SDD power supply cable broken 5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80 stable    
14 Calibration 07:41:00 ON     5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80 1:57:00 alive    
15 Calibration 01:10:00 ON     5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80 stable    
16 Calibration 03:29:00 ON     5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80.001 stable    
17 Heater check 00:19:23 ON     5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 79.998 stable    
18 Calibration 00:40:33 ON     5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80.002 not stable   1
19 Calibration 06:22:18 ON     5.14, 100.0, 60.0 2 ; 0.5   -100 6 ; 5       4*4 188+188(hole)   Cu OFF 80.001 1:42    
20 pi- * SDD trigger 11:47:58 ON K-, 4 SDD setup was moved to the K5 area 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 Old Old Old 4*4 188+188(hole) 3.8 Cu OFF 80.001 stable    
21 Calibration 01:39:59 ON K-, 4 Preamp noise was found 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 Old Old Old 4*4 188+188(hole) 3.8 Cu OFF 80.001 stable    
22 Self & TDC  08:45:22 ON K-, 4 spill gate and reset veto were made 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 Old Old Old 4*4 188+188(hole) 3.8 Cu OFF 80.001 00:50:00    
23 TFA timing check 00:18:18 ON K-, 4 TFA timing discri was too high 5.14, 100.0, 60.0 2 ; TFA 0.5, 0.5 200*1.5 TFA -135 6 ; 5 Old Old Old 4*4 188+188(hole) 3.8 Cu OFF 79.999 stable    
24 TFA timing check 10:39:29 ON K-, 4 TFA discri -135mV->-100mV but very noisy 5.14, 100.0, 60.0 2 ; TFA 0.5, 0.5 200*1.5 TFA -100 6 ; 5 Old Old Old 4*4 188+188(hole) 3.8 Cu OFF 80.001 2:40    
25 TFA timing check 01:22:04 ON OFF Mylar only, beam off 5.14, 100.0, 60.0 2 ; TFA 0.5, 0.5 200*1.5 TFA -100 6 ; 5 Old Old Old - 188 3.8 Cu OFF 80 0:04    
26 Foils only 01:10:53 OFF K-, 4 SDD support contains Ti ? Ti, Cr, Mn, Fe, Ni X-rays were observed 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 Old Old Old 4*4 188+188(hole) 3.8 Cu OFF 79.999 stable    
27 TM VETO of SDD 12:27:39 OFF K-, 4 TM was installed -> next TR and TL 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 - - 4*4 188+188(hole) 3.8 Cu OFF 80.001 2:07    
28 Calibration 04:02:12 ON OFF   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80.001 stable    
29 TL,TM,TR timing 12:31:00 OFF K-, 4 TL (Ni side) and  TR (Ti side) were installed 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80 04:36:24    
30 TL,TM,TR timing 08:09:52 OFF K-, 4   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 79.999 02:08:11   1
31 TL,TM,TR timing 12:28:06 OFF K-, 6 Production target was changed 4cm -> 6cm, reset veto 16.4 usec 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80 0:47   1
32 TL,TM,TR timing 00:37:05 OFF K-, 6 6cm PT, reset veto 16.4usec -> 50 usec 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80 stable   1
33 Calibration 01:17:42 ON K-, 6 spll ON/OFF gate was changed 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80.001 stable   1
34 Efficiency check 05:17:27 ON K-, 6   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80 stable   1
35 Efficiency check 11:18:30 ON K-, 4   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80 stable   1
36 X-ray timing check 01:19:01 ON K-, 4 TDC delay time 200 ns -> 100 ns 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80 00:10:00    
37 X-ray timing check 11:43:11 ON K-, 4 before this run, SDD power supply was mistaken 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80.002 05:37:00   1
38 X-ray timing check 02:14:05 ON K-, 4   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80.001 stable    
39 X-ray timing check 09:57:34 ON K-, 4 Added 400ns delay at TDC start and -400ns delay TDC stop (TMcoin) 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 6 ; 5 3*5 8*4 5*3 4*4 188+188(hole) 3.8 Cu OFF 80 stable    
40 New setup check 12:12:25 ON OFF SDD setup was moved upstream, 3.8m from focus point, New setup 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 01:17:00    
41 TAC test 05:58:35 ON K-, 4 TAC test to find the X-ray timing induced by beam 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 4:45   1
42 TAC test for TL(Ti) 12:58:43 ON K-, 4 changed the TAC stop TM -> TL 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 05:20:00   1
43 TAC test for TR(Ni) 01:13:46 ON K-, 4 changed the TAC stop TL -> TR 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable   1
44 TAC test for TR(Ni) 05:17:51 ON K+, 4 ->K+, 6 K+ beam run, during this run PT was changed 4cm->6cm 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable   1
45 TAC test for TR(Ni) 01:08:17 ON K-, 4 set the limit of TAC stop timing, and ajusted the gate of TAC ADC 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON?, OFF 1
46 TAC TM correlation 00:34:04 ON K-, 4 need more 2 usec delay for TM signal 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 stable ON, ON, OFF 1
47 TAC TR correlation 02:48:41 ON K-, 4   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, OFF 1
48 TAC TR correlation 11:11:28 ON K-, 4 TM veto was removed -> offline program was changed 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 4:51 ON, ON, OFF 1(TMveto removed)
49 TAC TM correlation 01:28:38 ON K-, 4 TAC stop signal was delayed 1usec longer than run 46 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, OFF 1
50 TAC TM correlation 00:29:50 ON K-, 4 TAC stop signal was delayed 500 ns longer than run 46 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, OFF 1
51 TAC TM correlation 00:31:22 ON K- ,4 Same as run 46 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, OFF 1
52 TAC TM correlation 00:17:00 ON K- ,4 gate was selected, the delay of TAC stop was same run 50 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, OFF 1
53 TAC TM correlation 00:09:46 ON K- ,4 gate was re-selected, the delay of TAC stop was same run 50 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, OFF 1
54 TAC TM correlation 07:12:38 ON K- ,4 same as run 53 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 not stable ON, ON, OFF 1
55 TAC & (TL/TM/TR) 03:21:09 ON K- ,4 final timing test 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.215 not stable ON, ON, OFF 1
56 TAC & (TL/TM/TR) 07:04:53 ON K- ,4   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, OFF 1
57 TAC & (TL/TM/TR) 16:35:18 OFF K- ,4 wihtout 55Fe source 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, OFF 1
58 TAC & (TL/TM/TR) 03:44:23 OFF K- ,4 TM coincidence gate was changed 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF   stable ON, ON, OFF 2
59 TAC & (TL/TM/TR) 14:07:02 OFF K- ,4 more shielded by black tape 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.002 2:02 ON, ON, OFF 2
60 TAC & (TL/TM/TR) 02:06:05 OFF K- ,4 bipolor noise was removed by BPLV logic 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 not stable ON, ON, OFF (Bipolar veto)
61 TAC & (TL/TM/TR) 07:26:29 OFF K- ,4 set the BPLV <- but this scaler was false to run 86 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON(false) 2
62 TAC & (TL/TM/TR) 07:09:05 OFF K- ,4   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 0:06 ON, ON, ON(false)  
63 Cryostat off test 01:40:27 OFF K- ,4 stopped Cryostat for 15 min 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 75-85? 15min Cryo OFF ON, ON, ON(false)  
64 TAC & (TL/TM/TR) 02:53:15 OFF K- ,4 unstable   5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON(false) 2
65 TAC & (TL/TM/TR) 02:02:27 ON K- ,4 set the 55Fe source 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON(false) 2
66 Odd even effect 03:35:40 ON K- ,4 changed the gain factor (2.5 times) to check odd even effect 5.14, 100.0, 60.0 2 ; 0.5 200*1.5 -100 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.007 stable ON, ON, ON(false)  
67 HV dependence 01:31:11 ON K- ,4 SDD HVs were changed, timing discri threshold -100mV -> -50 mV 5.00, 130.0, 64.0 2 ; 0.5 200*1.5 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON(false) 2
68 HV dependence 07:00:48 ON K- ,4   5.00, 130.0, 64.0 2 ; 0.5 200*1.5 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON(false)  
69 HV dependence 01:42:44 ON K- ,4   5.00, 130.0, 62.0 2 ; 0.5 200*1.5 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 not stable ON, ON, ON(false) 2
70 HV dependence 05:53:49 ON K- ,4   5.00, 130.0, 62.0 2 ; 0.5 200*1.5 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 stable ON, ON, ON(false) 2
71 HV dependence 08:01:42 ON K- ,4 only the gain factor of ORTEC 572 was chaged 5.00, 130.0, 62.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.002 stable ON, ON, ON(false) 2
72 Drift time check 01:50:13 ON K- ,4   5.00, 120.0, 50.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON(false) 2
73 Drift time check 07:18:20 ON K- ,4   5.00, 130.0, 50.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 6:59 ON, ON, ON(false) 2
74 Drift time check 02:10:15 ON K- ,4   5.00, 130.0, 50.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON(false) 2
75 Drift time check 05:35:57 ON K- ,4   15.0, 130.0, 60.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 0:41 ON, ON, ON(false) 2
76 Calibration 02:30:12 ON OFF   15.0, 130.0, 60.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.997 stable ON, ON, ON(false) 2
77 Calibration 03:11:39 ON OFF   5.00, 120.0, 60.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 stable ON, ON, ON(false) 2
78 Drift time check 04:32:17 ON K- ,4   5.00, 120.0, 60.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF - stable ON, ON, ON(false) 2,3
79 Calibration 02:47:36 ON OFF   20.0, 150.0, 4.93 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON(false) 2,3
80 Drift time check 01:04:10 ON K- ,4   20.0, 150.0, 4.93 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON(false) 2,3
81 Calibration 03:11:39 ON OFF   20.08, 160., 15.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON(false) 2,3
82 Calibration 03:11:39 ON OFF   4.68, 145.0, 30.92 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON(false) 2,3
83 Drift time check 03:11:39 ON K- ,4   4.68, 145.0, 30.92 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 6:04 ON, ON, ON(false) 2,3
84 Drift time check 03:11:39 ON K- ,4   4.68, 160., 30.92 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON(false) 2,3
85 Drift time check 03:11:39 ON K- ,4   4.00, 100.0, 62.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON(false) 2,3
86 Drift time check 02:40:45 ON K- ,4 unstable   4.00, 100.0, 62.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 2:05 ON, ON, ON 2,3
87 Drift time check 05:30:40 ON K- ,4 unstable   4.00, 100.0, 62.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 4:26 ON, ON, ON 2,3
88 Drift time check 02:07:59 ON K- ,4 unstable   4.00, 100.0, 62.0 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON 2,3
89 Calibration 02:47:47 ON OFF   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON 2,3
90 Drift time check 00:59:06 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON 2,3
91 Drift time check 02:07:37 ON K- ,4   10.3, 105.0, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.995 stable ON, ON, ON 2,3
92 Drift time check 02:00:09 ON K- ,4   10.3, 105.0, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 0:55 ON, ON, ON 2,3
93 Drift time check 00:55:17 ON K- ,4   10.3, 105.0, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 stable ON, ON, ON 2,3
94 Production 02:00:00 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON 2,3
95 Production 02:00:00 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 stable ON, ON, ON 2,3
96 Production 02:11:05 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.002 stable ON, ON, ON 2,3
97 Production 02:00:02 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
98 Production 01:52:36 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
99 Production 02:00:00 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.003 stable ON, ON, ON 2,3
100 Production 02:00:00 ON K- ,4 separator down low beam intensity 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 hungup ON, ON, ON 2,3
101 Production 1:48:31 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.002 stable ON, ON, ON 2,3
102 Production 01:17:02 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON 2,3
103 Production 02:01:47 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON 2,3
104 Production 01:33:07 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
105 Production 01:20:40 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 hungup ON, ON, ON 2,3
106 pi- beam run 02:00:01 ON pi-, 4 mass slit was opned about 4 times higher intesity beam 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON 2,3
107 Production 00:55:52 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON 2,3
108 pi- beam run 01:00:00 ON pi-, 4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
109 pi- beam run 01:00:01 ON pi-, 4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
110 Production 01:00:01 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 hungup ON, ON, ON 2,3
111 Production 00:10:22 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.997 hungup ON, ON, ON 2,3
112 Production 1:00:00?? ON K- ,4 start time is not clear 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF ? ? ON, ON, ON 2,3
113 Junk run 00:00:04 ON K- ,4 scaler test run 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF ? ? ON, ON, ON 2,3
114 Production 04:00:00 ON K- ,4 scaler CMS is changed, file size 2.0GB over 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON 2,3
115 Production 00:30:00 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF ? ? ON, ON, ON 2,3
116 Production 02:00:00 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF ? ? ON, ON, ON 2,3
117 Production 01:20:00 ON K- ,4 /d has no space… 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF ? ? ON, ON, ON 2,3
118 Production 00:22:54 ON K- ,4 /d has no space *.hbk files are moved 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
119 Production 01:26:30 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.955 stable ON, ON, ON 2,3
120 Production 02:00:00 ON K- ,4 get e549 pi-profile run 291? 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.002 stable ON, ON, ON 2,3
121 Production 02:00:06 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 hungup ON, ON, ON 2,3
122 Production 02:00:08 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 ? ON, ON, ON 2,3
123 Production 02:24:12 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
124 Production 02:00:00 ON K- ,4 Lakeshore was unstable before this run 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.001 stable ON, ON, ON 2,3
125 Production 05:58:19 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 ? ON, ON, ON 2,3
126 Drift time check 00:49:47 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 stable ON, ON, ON 2,3
127 Drift time check 00:36:21 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80.002 stable ON, ON, ON 2,3
128 Production 01:08:53 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON 2,3
129 Production 2:00:00 ON K- ,4 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.999 stable ON, ON, ON 2,3
130 Production 02:00:00 ON K- ,4   10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 79.998 stable ON, ON, ON 2,3
131 Production 01:51:53 ON K- ,4 Beam stopped from 5:51by Vacuum problem 10.3, 110.2, -64.1 2 ; 0.5 500*1.142 -50 5 + 3.7 ; 5 4*4 3*4 3*4 3*4 188+188 2.8 Cu OFF 80 stable ON, ON, ON 2,3
          The end of E549 beam time                                  
          From next run, E570 test bench runs start