Today's Progress 7. Aug. 2005

Situations....at this moment.

1. BLC tracking -> enabled, but shift correction, time-to-time dt-dx reconstruction are not yet. -> T0 consistency

2. VDC tracking -> enabled, time-to-time dt-dr reconstruction is now in progress. Spline correction is not yet. -> TC consistency

3. PDC tracking -> under construction. -> PA consistency

run-by-run-variation

run-by-run variation of VDC resolution for y-x znd y-z tracking BEFORE dt-dr time-to-time reconstruction and spline correction for COSMIC RAY DATA. Horizontal axis represents the run number and the vertical resolution by mm(sigma). The original dt-dr has been constructed from the cosmic-ray data from run 91 to 116. The resolution of VDC bottom is slightly better, as it used to be the case in E471. If it is reconstructed time-to-time, then the resolution achieved will be below 300 micron WITHOUT spline correction. Some hardware troubles is supposed to have occured for VDCbottom in run 259 and 260.

69->90 VDC-tracking-term1

91->116 VDC-tracking-term2

117->141 VDC-tracking-term3

142->162 VDC-tracking-term4

163->188 VDC-tracking-term5

189->220 VDC-tracking-term6

221->240 VDC-tracking-term7

241->258 VDC-tracking-term8